I twisted my ankle last week from playing basketball. It damaged my ligament so I could not move freely.
Therefore, I could not help on making another solar panel rack that was requested by the solar team. However i should be able to help with whatever comes next.
Tuesday, April 25, 2017
week 32: presentation 2
Public prototyping was overall successful. the only thing was that the bogie was not able to work with phone app.
Week 31: Public prototyping in 3 days
All teams looks to have a promising progress on the 1/12 scaled model. the goal was to have bogie looping half the track, one bogie looping the full track, one bogie being able to go from station to station, and the last one being able to be controlled from cell phone app.
The looks fully put together and functional. we are excited to see the full project at the event.
The looks fully put together and functional. we are excited to see the full project at the event.
week 30: Paseo Public Prototyping
Paseo Public Prototyping is coming up on next the weekend. All teams are working over time in order to get the project working. We will be in charge of disassembling the track, moving it to our spot, and bring it back to the shop at the end of the day.
There are currently no outstanding requests from other teams so we would be in the lab and help who ever need an extra hand.
There are currently no outstanding requests from other teams so we would be in the lab and help who ever need an extra hand.
Wednesday, March 22, 2017
week 29: helping other teams
I was told that the track improvment team did not successfully joint the upper guide using metal adheisive. They will come up with a different method, possibly using nuts and bolt.
In the mean time, I helped the posistion team to cut the thin metal strips. The sheet metal cutter in the shop doea not really measure 5mm of length so we had to use a ruler and eyeball to have a precise cut. although we had a template to measure 5mm, the results arent stable and there are still some of them wasted due to the size difference.
In the mean time, I helped the posistion team to cut the thin metal strips. The sheet metal cutter in the shop doea not really measure 5mm of length so we had to use a ruler and eyeball to have a precise cut. although we had a template to measure 5mm, the results arent stable and there are still some of them wasted due to the size difference.
week 28: whats next
after the first presentation, we are basiclly free to help out other teams.
Dr. furman asked us to document every thing and prepare a poseter for the maker fair. that would be our final thing to do. right now we would focus on getting the track ready for the paseo public. the goal is to have everyone test their products before then.
Dr. furman asked us to document every thing and prepare a poseter for the maker fair. that would be our final thing to do. right now we would focus on getting the track ready for the paseo public. the goal is to have everyone test their products before then.
Monday, March 13, 2017