Wednesday, March 22, 2017

week 29: helping other teams

I was told that the track improvment team did not successfully joint the upper guide using metal adheisive. They will come up with a different method, possibly using nuts and bolt.
In the mean time, I helped the posistion team to cut the thin metal strips. The sheet metal cutter in the shop doea not really measure 5mm of length so we had to use a ruler and eyeball to have a precise cut. although we had a template to measure 5mm, the results arent stable and there are still some of them wasted due to the size difference.

No comments:

Post a Comment